Various Water and Wastewater System Extensions; Charlotte County Utilities, Port Charlotte

Southeastern Technical Solutions designed, permitted and oversaw the construction administration of numerous sanitary sewer collection and water distribution system extensions ranging in length from approximately 200 linear feet to 1,500 linear feet. Design challenges included aerial and subaqueous canal crossings and directional drilling or jack and bore construction requirements to minimize impacts to existing roadways, driveways, and/or landscaping.

Click on any image below to view the full size image.

« Back To Gallery «