Lehigh Acres #2 Water Treatment Plant; Florida Water Services, Lehigh Acres
Southeastern Technical Solutions president, Ms. Shondra Neumeister, was the Engineer of Record for the design and permitting of a basic water treatment plant and the preliminary design of reverse osmosis water treatment plant. The basic water treatment plant was permitted at 2.5 MGD and consisted of aeration, storage, disinfection, and high service pumping. The reverse osmosis water treatment plant was designed at 5.0 MGD, expandable to 10.0 MGD, and incorporated pretreatment and membrane treatment into the basic water treatment plant design.
Click on any image below to view the full size image.
